The Joint Contracts Tribunal (JCT) publishes the standard building contracts most widely used in the UK, with the current 2024 Edition. NEC4 is the main alternative and is common in public sector and infrastructure work.

The main options

ContractTypical useDesign responsibility
JCT Homeowner contractsWork on a consumer's own home, with or without a consultantClient's designer, or as agreed
Minor Works Building Contract (MW)Simple, short projects with a complete designClient's design team
Minor Works with contractor's design (MWD)As MW, with part of the design by the contractorShared, as stated in the contract
Intermediate Building Contract (IC / ICD)Larger or more complex work with a detailed design and specialist tradesClient's team; ICD adds a contractor's designed portion
Design and Build Contract (DB)Contractor completes and is responsible for the design from the Employer's RequirementsContractor
NEC4 Engineering and Construction Contract (ECC)Public sector, frameworks and projects needing active programme and risk managementSet by the chosen main option

Points worth checking whatever the form

  • How the contract sum is calculated and what happens to provisional sums.
  • Payment provisions: due dates, final dates and notices that comply with the Construction Act.
  • Retention, liquidated damages, insurances and any collateral warranties required by funders or purchasers.
  • Bespoke amendments, which should be read carefully and priced for.

For smaller domestic projects we use our own terms and conditions, written for homeowners in plain English, and we are happy to work on the client's chosen JCT or NEC form on larger projects.